FL: I-295 and US 1 need points for new FL 9B connector

 
Post new topic   This topic is locked: you cannot edit posts or make replies.    Clinched Highway Mapping Forum Index -> Old topics
View previous topic :: View next topic  
Author Message
oscar_voss



Joined: 27 Jul 2008
Posts: 622
Location: Arlington VA

PostPosted: Sat Jan 18, 2014 12:15 am    Post subject: FL: I-295 and US 1 need points for new FL 9B connector Reply with quote

I drove FL 9B earlier today, a new route between I-295 and US 1 (construction still underway west of US 1 to extend the route). Both the I-295 and US 1 files need waypoints to reflect the new connection. OSM/Mapnik shows the routing for FL 9B, and also that it's open. I didn't think to jot down the exit number on I-295, but OSM indicates it's exit 58.
Back to top View user's profile Send private message Send e-mail Visit poster's website
rickmastfan67



Joined: 14 Jul 2008
Posts: 2031
Location: Pittsburgh, PA

PostPosted: Sat Jan 18, 2014 1:01 am    Post subject: Reply with quote

The points are already in the files online in the HB, but are hidden if you need them right away.

+FL9B in US-1's file.
+58 in I-295's file.

I did it this way because in I-295's file, I would have needed the same area for a shaping point anyways, so, why not label it as the future exit # instead.

Anyways, in my next submission, I'll submit the files to Tim without the "+" in front of both labels.

On a side note, did FL-9B have an exit number for US-1 by some odd chance?
Back to top View user's profile Send private message AIM Address
oscar_voss



Joined: 27 Jul 2008
Posts: 622
Location: Arlington VA

PostPosted: Sat Jan 18, 2014 7:21 am    Post subject: Reply with quote

rickmastfan67 wrote:
On a side note, did FL-9B have an exit number for US-1 by some odd chance?

I don't remember seeing one.
Back to top View user's profile Send private message Send e-mail Visit poster's website
rickmastfan67



Joined: 14 Jul 2008
Posts: 2031
Location: Pittsburgh, PA

PostPosted: Mon Jun 16, 2014 6:36 am    Post subject: Reply with quote

Update has been submitted to unhide the points on US-1 and I-295.

Also submitted a new I-795 Future file for FL-9B. That way, you can 'clinch' FL-9B as it's Future Interstate Number till the FL State Highway set is done.
Back to top View user's profile Send private message AIM Address
rickmastfan67



Joined: 14 Jul 2008
Posts: 2031
Location: Pittsburgh, PA

PostPosted: Tue Jul 01, 2014 6:10 am    Post subject: Reply with quote

The points for FL-9B on both US-1 (FL9B) and I-295 (58) are now visible.

< Locked >
Back to top View user's profile Send private message AIM Address
Display posts from previous:   
Post new topic   This topic is locked: you cannot edit posts or make replies.    Clinched Highway Mapping Forum Index -> Old topics All times are GMT - 4 Hours
Page 1 of 1

 
Jump to:  
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum


2005 Powered by phpBB © 2001, 2005 phpBB Group

Free Web Hosting | File Hosting | Photo Gallery | Matrimonial


Powered by PhpBB.BizHat.com, setup your forum now!
For Support, visit Forums.BizHat.com