yakra

Joined: 30 Jul 2008 Posts: 2600 Location: Area Code 207
|
Posted: Wed Apr 11, 2012 8:42 pm Post subject: Nova Scotia outlook / 5-Year Plan |
|
|
http://www.gov.ns.ca/tran/highways/constructionprojects.asp
http://www.gov.ns.ca/tran/highways/fiveyearplan.asp
http://www.gov.ns.ca/tran/highways/5yearplan/Plan_2010-11.pdf
http://www.gov.ns.ca/tran/highways/5yearplan/Plan_2011-12.pdf
http://gov.ns.ca/tran/highways/5yearplan/Plan_2012-13.pdf
-------- 2010-11
Highway 101; Mary Jane Riley Interchange
Highway 101; Hectanooga Road Interchange Yarmouth 100 Series Expansion
Highway 104; Twinning 1 km east of Pine Tree Road to 500 m east of Route 245 (Multiple Year Project)
Highway 104; Antigonish Phase 1, 1.9 km west of Exit 31A to 0.6 km west of Exit 34, (total 7.9 km) (Multiple Year Project)
Trunk 1; Granite Drive Roundabout (including a portion of the future Highway 101 Connector, New Minas
(not in shapefiles yet, 9.0)
-------- 2011-12
Highway 101; Mary Jane Riley Interchange
Highway 104; Antigonish Phase 1, from 1.9 km west of Exit 31A to 0.6 km west of Exit 34 (total 7.9 km) (Multiple Year Project)
Highway 104; Antigonish Phase 2, from Beech Hill Road to Taylor Road, 8.0 km (Multiple Year Project)
Highway 104; Twinning 1 km east of Pine Tree Road to 500 m east of Route 245 (Multiple Year Project)
-------- 2012-13
Highway 101; Granite Dr Interchange and Connector (Multiple Year Project)
Highway 103; Port Mouton & Port Joli Bypass Broad River to Port Joli (Multiple Year Project)
Highway 103; Interchange and connector between exits 5 and 6 Phase 1 (Multiple Year Project)
Highway 104; Antigonish Phase 1, 1.9 km west of Exit 31A to 0.6 km west of Exit 34 (total 7.9 km)
Highway 104; Antigonish Phase 2, from Beech Hill Road to Taylor Road, 8.0 km (Multiple Year Project)
Highway 104; Twinning 1 km east of Pine Tree Road to 500 m east of Route 245
Highway 107; Burnside to Bedford Phase 1 (Multiple Year Project)
-------- 2013-14
Highway 101; Granite Dr Interchange and Connector (Multiple Year Project)
Highway 103; Port Mouton & Port Joli Bypass Broad River to Port Joli (Multiple Year Project)
Highway 103; Interchange and connector between exits 5 and 6 Phase 1 (Multiple Year Project)
Highway 104; Antigonish Phase 2, from Beech Hill Road to Taylor Road, 8.0 km (Multiple Year Project)
Highway 104; Taylor Road to Monastery - Paqtnkek Interchange (Multiple Year Project)
Highway 107; Burnside to Bedford Phase 1 (Multiple Year Project)
Trunk 4: from 0.2 km west of Campbell's Bridge westerly to 0.2 km west of MacNab's Bridge – 6.1 km (Multiple Year Project)
Cabot Trail (Trunk 30): from the Old Cabot Trail Road intersection northerly to LaPointe DeHavre Road – 6.4 km (Multiple Year Project)
-------- 2014-15
Highway 101; Granite Drive Interchange and Connector (Multiple Year Project)
Highway 103; Port Mouton & Port Joli Bypass Broad River to Port Joli (Multiple Year Project)
Highway 103; Interchange and connector between exits 5 and 6 (Multiple Year Project)
Highway 107; Burnside to Bedford Phase 1
(all hidden; see 2015-16)Cabot Trail (Trunk 30): from the Little River Road southerly – 6km
-------- 2015-16
Highway 103; Interchange and connector between exits 5 and 6 (Multiple Year Project)
Trunk 4: from Soldiers Cove Road westerly to 1.8 km west
of Corbett's Cove Road - 5.2 km
Cabot Trail (Trunk 30): from Meadows Road (north end) northerly
to 1 km south of Tarbotville Road - 5.5 km
-------- 2016-17
Highway 101; Granite Drive Interchange and Connector (Multiple Year Project)
Highway 101/102 Interchange Structure & Ramp Modifications (Multiple Year Project)
Highway 103: Broad River to Port Joli, new alignment (Multiple Year Project)
• Port Mouton Bypass
• Port Joli Bypass
Highway 104: Antigonish Phase 2, from Beech Hill Road to Taylor Road, 8 km (Multiple Year Project)
Highway 104; Taylor Road to Monastery - Paqtnkek Interchange (Multiple Year Project)
Trunk 4; from 1.8 km west of Corbett's Cove Road westerly to the Canal Bridge in St. Peters - 6.2 km
Cabot Trail (Trunk 30): from Route 312 intersection northerly - 6.3 km
-------- 2017-18
Highway 107: Burnside to Bedford Phase 1 (Multiple Year Project)
Cabot Trail (Trunk 30): from 1.0 km south of Tarbotville Road northerly
to Route 312 - 4.1 km
-------- 2018-19
Projects to be determined under new Build Canada Plan
Last edited by yakra on Wed Nov 16, 2016 3:07 pm; edited 19 times in total |
|
Back to top |
|
 |
yakra

Joined: 30 Jul 2008 Posts: 2600 Location: Area Code 207
|
|
Back to top |
|
 |
yakra

Joined: 30 Jul 2008 Posts: 2600 Location: Area Code 207
|
Posted: Fri Sep 07, 2012 6:46 pm Post subject: |
|
|
Highway project transitioning
Quote: | “All the asphalt is complete, we’re painting lines today,
...
They’re installing some jersey barrier, which is actually going to act as a noise barrier, along Trunk 7 and there are also rumble strips that still need to be installed and some signage, but we’re very close to opening.
...
The weather has been great...The roads opened early and the contractor really hasn’t lost many days due to weather, so they’re ahead of schedule as far as the opening. |
|
|
Back to top |
|
 |
yakra

Joined: 30 Jul 2008 Posts: 2600 Location: Area Code 207
|
|
Back to top |
|
 |
yakra

Joined: 30 Jul 2008 Posts: 2600 Location: Area Code 207
|
Posted: Sat Nov 24, 2012 8:48 pm Post subject: |
|
|
Hebbs Cross to Mill Village New 2-lane Highway
Lunenburg Co.
Route Location, Functional Design |
|
Back to top |
|
 |
|
|