View previous topic :: View next topic |
Author |
Message |
admin Site Admin

Joined: 13 Jul 2008 Posts: 4053 Location: Maryland
|
Posted: Fri Jul 03, 2009 10:23 pm Post subject: Ireland Motorways |
|
|
http://www.ideasforcheapstuff.com/inex/roads/Misc/index.html
has a list of all the openings through 2015 (because 6-year schedules always work out).
Things to keep an eye out for in 2009:
Code: |
Aug.:
M6 J13-14 Athlone-Ballinasloe
Oct.:
M7 J24-28 Nenagh-Limerick
Dec.:
M3 Clonee/North of Kells
M9 J2-4 Kilcullen-Carlow
|
|
|
Back to top |
|
 |
admin Site Admin

Joined: 13 Jul 2008 Posts: 4053 Location: Maryland
|
Posted: Sat Jul 18, 2009 11:22 am Post subject: |
|
|
Ireland is promoting a bunch of completed freeways to motorway status in late August.
http://www.transport.ie/viewitem.asp?id=10193&lang=ENG&loc=2270
This must have been somewhat like the US in the 1960s - giant leaps in completed freeway mileage and Interstate designations. |
|
Back to top |
|
 |
admin Site Admin

Joined: 13 Jul 2008 Posts: 4053 Location: Maryland
|
|
Back to top |
|
 |
admin Site Admin

Joined: 13 Jul 2008 Posts: 4053 Location: Maryland
|
|
Back to top |
|
 |
admin Site Admin

Joined: 13 Jul 2008 Posts: 4053 Location: Maryland
|
Posted: Tue Dec 29, 2009 4:46 pm Post subject: |
|
|
Next 6 months:
Quote: | 2010-02 M9 Jct 10-12 Kilkenny-Waterford
2010-03 M7 Nenagh-Limerick (Nenagh-Limerick J26-28)
2010-06 M3 Clonee/North of Kells (Part 1)
2010-06 M3 Clonee/North of Kells (Part 2) |
Taken from
http://www.ideasforcheapstuff.com/inex/roads/Misc/index.html |
|
Back to top |
|
 |
admin Site Admin

Joined: 13 Jul 2008 Posts: 4053 Location: Maryland
|
Posted: Tue Mar 23, 2010 1:50 am Post subject: |
|
|
M9 Jct 10-12 Kilkenny-Waterford
Opened on 3/22, added.
M7 Nenagh-Limerick (Nenagh-Limerick J26-27)
To open in a couple days.
M7 Nenagh-Limerick (Nenagh-Limerick J27-28)
To open in May or June.
From boards.ie:
http://www.boards.ie/vbulletin/showthread.php?t=2055681234&page=5
Quote: | 2010 Openings
now open...
M50/M1 - Jan 16th
M50/J14 - Feb 8th
M9 Waterford-Knocktopher - Mar 22nd
estimated openings..
M7 Nenagh-Birdhill - March 25th (???)
M3 Clonee-Kells - May (???)
M7 Birdhill-Limerick - May/June (???)
M7/M8 Portloaise/Cullahill/Castletown - June (???)
N7/N18 Shannon Tunnel - Jun (???)
M18 Gort-Crusheen - June (???)
M9 Carlow-Knocktopher - Aug (???)
N21 Castleisland - Sep/Oct (???)
M50 Upgrade (J5) - Sept/Oct (???)
M50 Upgrade (J6)- Sept/Oct (???)
M7 Castletown-Nenagh - Oct (???) |
|
|
Back to top |
|
 |
admin Site Admin

Joined: 13 Jul 2008 Posts: 4053 Location: Maryland
|
Posted: Thu Mar 25, 2010 4:01 pm Post subject: |
|
|
NRA: New section on the M7 Limerick to Nenagh from Birdhill to Limerick (15.5km) will open by the end of next week
That's the info I learned from my first-ever look at Twitter. I had been so good at ignoring that site for so long. |
|
Back to top |
|
 |
admin Site Admin

Joined: 13 Jul 2008 Posts: 4053 Location: Maryland
|
|
Back to top |
|
 |
si404
Joined: 07 Oct 2009 Posts: 708
|
Posted: Thu Sep 09, 2010 2:54 am Post subject: |
|
|
The M9 opens today - bizzarely it's already on OSM as open, when the last few schemes opened at 4pm IST. |
|
Back to top |
|
 |
admin Site Admin

Joined: 13 Jul 2008 Posts: 4053 Location: Maryland
|
Posted: Thu Sep 09, 2010 2:40 pm Post subject: |
|
|
Thanks for the notice. Finally all the M9 pieces in the HB can be a single "M9". |
|
Back to top |
|
 |
si404
Joined: 07 Oct 2009 Posts: 708
|
Posted: Thu Sep 09, 2010 5:16 pm Post subject: |
|
|
"finally"? - The southern bit did open that long ago. Everything south of junction 1 has opened in the last 12 months! |
|
Back to top |
|
 |
si404
Joined: 07 Oct 2009 Posts: 708
|
Posted: Tue Sep 28, 2010 1:59 pm Post subject: |
|
|
http://www.sabre-roads.org.uk/forum/viewtopic.php?f=1&t=25903
M7 Birdhill-Limerick is open now (delayed due to subsidence in the marsh).
This means that two of the M7 routes will merge together - I'll keep the Limerick section.
There's now only two sections of motorway in Ireland under construction now - M7 between J21 and J25 and M18 Ennis-Gort - this must be the lowest for some time. However, the M17/M18 Gort-Tuam scheme has been approved, and the M20 is on it's way to approval, so Europe's fastest growing motorway network isn't stopping expansion yet, just slowing down a bit. |
|
Back to top |
|
 |
si404
Joined: 07 Oct 2009 Posts: 708
|
Posted: Mon Oct 11, 2010 5:57 pm Post subject: |
|
|
Outlook for the two schemes under construction:
- M18 Crusheen - Gort 7 Nov
- M7 Castletown - Nenagh 15 Nov
|
|
Back to top |
|
 |
ChrisZwolle
Joined: 30 Dec 2009 Posts: 72 Location: Zwolle, Netherlands
|
|
Back to top |
|
 |
|