Texas outlook

 
Post new topic   Reply to topic    Clinched Highway Mapping Forum Index -> 6-Month Outlook
View previous topic :: View next topic  
Author Message
yakra



Joined: 30 Jul 2008
Posts: 2600
Location: Area Code 207

PostPosted: Thu May 17, 2012 5:19 pm    Post subject: Texas outlook Reply with quote

AASHTO USRN May 2012:

US 377 (establish)
The proposed route will begin approximately 1.4 miles north of SH
171, it will run southwestward around central Cresson and
terminate approximately 1.1 miles south of SH 171. The route will
travel north to south along a four-lane facility on a new location, a
distance of approximately 2.8 miles.
US 377_2012_AASHTO_Application.pdf

US 377 Business (recognition)
The proposed route will begin approximately 1.4 miles north of SH
171, it will run southwestward through the city of
Cresson and terminate approximately 1.1 miles south of SH 171.
The route will travel north to south along an existing five-lane
facility, a distance of approximately 2.5 miles.
BU377_2012_AASHTO_Application.pdf
Back to top View user's profile Send private message
yakra



Joined: 30 Jul 2008
Posts: 2600
Location: Area Code 207

PostPosted: Fri May 10, 2013 2:14 am    Post subject: Reply with quote

US 67 Business Approved (May 2013)
The designation will begin approximately 1.6 miles
northeast of FM 219 in Erath County, it will run
southwestward through the city of Dublin and
terminate approximately 1.8 miles northeast of the
Comanche County line. The route will travel north to
south along an existing two-lane facility currently
designated as US 67/377, a distance of
approximately 4.8 miles.

Also: Still looking for evidence of the US271 Mt Pleasant bypass (& Bus route) S of US67 approved by AASHTO May 2010
Back to top View user's profile Send private message
yakra



Joined: 30 Jul 2008
Posts: 2600
Location: Area Code 207

PostPosted: Sun Nov 03, 2013 10:39 pm    Post subject: Reply with quote

Grading for the Mt Pleasant bypass is visible in Google Satellite.
http://www.keeptituscountymoving.com
Completion time may be around Feb 2014, +/-?
Back to top View user's profile Send private message
yakra



Joined: 30 Jul 2008
Posts: 2600
Location: Area Code 207

PostPosted: Sat Dec 14, 2013 12:36 pm    Post subject: Reply with quote

Construction for a Copperas Cove bypass is visible in Google Satellite. Don't know if this has already shown up in the AASHTO minutes; probably not; if it did it would be on my radar. No idea when it's scheduled to open.

Current watchlist:
US271 Mt Pleasant bypass / business (S of US67)
US377 Cresson bypass / business (TX171)
US67 (/377) business (/bypass?), Dublin (FM219)
US190 Copperas Cove bypass (E of FM2657)
Back to top View user's profile Send private message
yakra



Joined: 30 Jul 2008
Posts: 2600
Location: Area Code 207

PostPosted: Mon Feb 24, 2014 1:12 pm    Post subject: Reply with quote

A loop around the west side of Weatherford (Ric Williamson Memorial Highway) is being constructed, and will connect to I-20 near Mile 405. Plans are to eventually expand it around the east side too.
http://www.weatherforddemocrat.com/newstoppers/x714769838/Eastern-Loop-moving-ahead

Current watchlist:
US190 Copperas Cove bypass (E of FM2657) (the end of 2013 -- no, make that April/May 2014 -- no, make that Fall 2014)
US271 Mt Pleasant bypass / business (S of US67)

US377 Cresson bypass / business (TX171)
US67 (/377) business (/bypass?), Dublin (FM219)
Weatherford loop incl I-20 Exit 405
Chisholm Trail Parkway interchanges at I-20(432), TX183, I-30 (May 11)
TX45: O'Connor Drive interchange under construction NW of McNeilRd

GoogSat: realignment at US59 US59Bus/69_N
San Antonio: US281 Wurzbach Pkwy interchange (NakDr & BitRd overlap. No new point.)
TX68 connecting US281 / I-69C to US83 / I-2
Collin Co, TX: Part of FM 543 Decom; Part Now SPUR 195

AASHTO USRN May 2014:
TX I-69: stitches I-69 & I-69Sug together. Pending FHWA approval.
TX I-69C extension to FM490: open Feb 2015. Pending FHWA approval.
TX I-69ERob extension to FM892: open Nov 2014. Pending FHWA approval.
TX I-69W, Laredo: Pending FHWA approval.

TX US59, Laredo: Pending FHWA approval -- but US59Bus was unconditionally approved?
TX US59BusLar: Approved, but mainline US59 is pending FHWA approval?


Last edited by yakra on Sun Sep 20, 2015 9:50 am; edited 2 times in total
Back to top View user's profile Send private message
yakra



Joined: 30 Jul 2008
Posts: 2600
Location: Area Code 207

PostPosted: Thu Sep 10, 2015 8:19 pm    Post subject: Reply with quote

Many of the items in the previous post have been updated in TravelMapping.
The northern half of the Dublin bypass is complete, and US67 & 377 get a TX267 point.
I suppose that when the whole thing's completed, then the US67 (/377?) relocation and business route approved by AASHTO in May 2013 will finally become official. Until then, it's TX267.

Current watchlist:
US377 Cresson bypass / business (TX171)
TX267 / Dublin bypass, southern segment
Ric Williamson Memorial Hwy eastern extension, Weatherford
GoogSat: realignment at US59 US59Bus/69_N
TX68 connecting US281 / I-69C to US83 / I-2
TXSpr1966, El Paso, connects to US85

AASHTO SCOH USRN May 2014
TX US59, Laredo: Pending FHWA approval -- but US59Bus was unconditionally approved?
TX US59BusLar: Approved, but mainline US59 is pending FHWA approval?

AASHTO SCOH USRN May 2015
US 87 - Relocation & Recognition of a Business Route, Big Spring
Back to top View user's profile Send private message
Display posts from previous:   
Post new topic   Reply to topic    Clinched Highway Mapping Forum Index -> 6-Month Outlook All times are GMT - 4 Hours
Page 1 of 1

 
Jump to:  
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum


2005 Powered by phpBB © 2001, 2005 phpBB Group

Free Web Hosting | File Hosting | Photo Gallery | Matrimonial


Powered by PhpBB.BizHat.com, setup your forum now!
For Support, visit Forums.BizHat.com