View previous topic :: View next topic |
Author |
Message |
oscar_voss

Joined: 27 Jul 2008 Posts: 622 Location: Arlington VA
|
Posted: Sun Jan 29, 2012 12:02 pm Post subject: MX: New MX 40 bypass/realignment could open late 2012 |
|
|
An article in today's Washington Post features a new toll road under construction along part of MX 40 between Durango and Mazatlan, including the record-setting cable-stayed Baluarte Bicentennial Bridge which is a quarter-mile above the Baluarte river. The article has a photo of the new bridge and a map of the new road, which it says could open as soon as late 2012. It's unclear from the article whether the new road will get its own route number or just take over the existing MX 40 designation. |
|
Back to top |
|
 |
admin Site Admin

Joined: 13 Jul 2008 Posts: 4053 Location: Maryland
|
Posted: Sun Jan 29, 2012 7:40 pm Post subject: |
|
|
Probably the old road will remain MEX 40 and the new road will be MEX 40D. That is quite a bridge. |
|
Back to top |
|
 |
|